Northeast Shires
Home Page


Stallions

Shipped Chilled
and Frozen:

Isaac
Nitro

Frozen Semen
Only:

Speculator

Prospects:
Intrepid

Donor Mares:
Marie
Bridget

Brood Mares:
Abbigail
Reva

Recipient Mares:
Amelia
Angie
Appletini

For Sale

Barncam

Frozen Semen

Embryos

Show Pictures
&Video

Foals from
Northeast Shires

2011 Farm Pictures
2006 Farm Pictures
2004 Farm Pictures
2002 Farm Pictures

Arena Construction
Equine Rescue Class

Proud member
of the

American
Shire Horse
Association



Northeast Shires
Janet Long

34 Howards Lane
Epsom, NH 03234
(603)930-6975 (cell)
janet@neshires.com

Indoor Arena

Our arena and new stall barn are designed for draft horses and driving.  The indoor arena is 200' X 80'.  Attached at the east end is a stall barn measuring 36' X 80' which includes a feed room, tack room, show tack room, six 12' X 12' stalls, and two 12' X 16' stalls.  Six of these stalls will have attached paddocks.  The new barn is in addition to our existing 60' X 36' barn which contains five 12' X 15' stalls, two tie stalls, tack room, feed room, and wash stall. 

Our new indoor arena is being built by Center Hill Barns out of Deerfield New Hampshire.

Completed Arena
(Click on a small picture to go to the album)

           


September 2, 2008
Concrete in stall barn aisle is complete.  Stalls are underway.  The electric main panel has been installed.  The main water hydrant has been installed.  We have laid down tubing for radiant heating in the feed, tack, and show tack rooms.  All interior vmatch has been installed in the indoor.  All siding on the stall barn has been installed along with the exterior stall doors.  Each of the six exterior stalls will have their own paddock directly attached to the stall.
(Click on a small picture to go to the album)

                                     


August 4, 2008
Roof on the stall barn is complete along with the ceiling.  All lights, fans, and speakers have been installed in the arena.  Kick-boards and V-match installation in the arena is well underway.
(Click on a small picture to go to the album)

                        


July 18, 2008
Posts are in for the stall barn.  Still more fill has been brought in.  Kickboards on the northend have started being installed.
(Click on a small picture to go to the album)

          


July 14, 2008
The foundation for the stall barn is complete.  The west side and south side siding is complete besides the trim.  The siding on the north side is in the works.  Installation of lights has started.
(Click on a small picture to go to the album)

             


July 08, 2008
Footings for the stall barn went in.  Windows on the west end were installed along with some siding.
(Click on a small picture to go to the album)

      


July 07, 2008
Ceiling is in.
(Click on a small picture to go to the album)

    


July 01, 2008
The metal roof is complete.
(Click on a small picture to go to the album)

           


June 24, 2008
Everything is now ready for the metal roof to go up.
(Click on a small picture to go to the album)

           


June 12, 2008
Today the crane put the trusses up.
(Click on a small picture to go to the album)

                                                    


June 11, 2008
The trusses are complete.  The site for the stall barn has been filled and is ready for the footings.
(Click on a small picture to go to the album)

      


May 28, 2008
The trusses are tied together in to 36' wide sections on the ground.
(Click on a small picture to go to the album)

     


May 21, 2008
Trusses were delivered today. The north side wall frame is nearly complete. Fill for the stall barn is being layed down.
(Click on a small picture to go to the album)

            


May 19, 2008
Today most of the posts were installed.
(Click on a small picture to go to the album)

          


May 15, 2008
The foundation for the arena is complete  They have started adding the foundation drains and are back filling.
(Click on a small picture to go to the album)

           


April 24, 2008
Forms came off the west side foundation while more concrete was pour on the south wall foundation and footings.
(Click on a small picture to go to the album)

       


April 23, 2008
Forms for the west side foundation went up and concrete was poured.
(Click on a small picture to go to the album)

      


April 21, 2008
Concrete was poured for the west side footings.
(Click on a small picture to go to the album)

     


April 19, 2008
Forms for the west side footings went in today.
(Click on a small picture to go to the album)

    


April 17, 2008
More fill and trenches for the west side footings.
(Click on a small picture to go to the album)

    


April 16, 2008
More fill today.
(Click on a small picture to go to the album)

    


April 15, 2008
Fill was brought in today.  To level the site, the west end is cut down and the east end is being built up with fill.